DL 41 BURAYU, DL 31/35 SULULTA, DL 40 BURAYU
- Employer: CET
- Completed
METU TO MASHATRANSMISSION LINE(48 TOWERS OR 17.34KM)
- Employer: SINO HRDRO
- Completed
LV & MV Construction
- Employer: ZHEFU
- Completed
DENEBA TO DEBRE BRHAN23oKV TRANSMISSION LINE
- Employer: XD Company
- Completed
Substation, Mv, LV XLPECable
- Employer: RORAK
- Completed
LV & MV Construction
- Employer: ZHEFU
- Completed
Ditch And Walkway
- Employer: CCECCC
- Completed
Safari com wakanda projects(Tower erection, graveling, Larine and more)
- Contract amount: LUMP SUM
- Employer: Sino hydro and alkan
- Completed
Telecom Construction
- Employer: GTC
- Completed
Holeta-Dedesa-GERDConductor and OPGWStringing
- Employer: CET
- Completed
RTU Foundation
- Employer: SINO HRDRO
- Completed
Rehabilitation Mv LineFoundation, Cable
- Employer: Sino hydro and alkan
- Completed
Supply and installation of 33kv high voltage concrete electric pole
- Employer: Dashin breweries share company
- Completed
Optical fiber laying and maintenance construction works-SCADA Distribution management system (DMS)
- Employer: Sino hydro
- Completed
Supply and installation of 15kv high voltage concrete electric pole
- Employer: Dashin breweries share company
- Completed
Metu –Masha Transmission line Tower Erection
- Employer: Sinohydro
- Completed
Lemi NationalCement 33KV Distribution line
- Employer: Lemi National Cement
- Completed
Lemi-Jama 33KV Distribution line
- Employer: XD Company
- Completed
Metu-Masha Transmission line Conductor cable and OPGW Stringing work
- Employer: Sinohydro
- Completed
Ethio-telecom Infrastructure and Tower Erection work
- Employer: Ethio-Telecom
- Completed
Construction of 0.049KM Double Circuit Transmission Line by LILO Configuration of Legetafo to Combolcha-II Transmission Line
- Employer: Nixin Paper Manufacturing PLC
- Completed
LIST OF SATISFIED CUSTOMERS
British Embassy
Installation And Residence House.
Addis Ababa Foam
Electrical and fire alarm design and installation.
Deweto International LTD
Automation, Control System, plc and Erection.
GETAHUN BESHAH HOTEL
Electrical Design and installation.
BORAN REAL ESTATE
Electrical Design and installation supervision
MINAROL GUEST HOUSE
Electrical Design and installation.
EKK TRADING AND INDUSTRY
Eight Plastic cans injection Molding machines PLC reprogramming and installation.
Power China
A construction of MV (15 KV) combined and DTU Substation civil and electrical work.
GELAN PLC
Soft making machine motor drive design and panel board assembly.
Kospi PLC
- Corrugation Machine PLC programming
- DNC 60 Automatic Numerical Pressing Machine Programming..
Amhara regional conference center
Fire alarm, security access control and CCTV integration Work using GE Security.
ROYAL FOAM
Raw foam cutter manual system automation using S7-200 Siemens PLC Motor controller design and installation.
Osaka Steel Plc
- Corrugation Machine Human Machine Inter Face Design And Installation.
- Automatic Coil Reel Edge Shifting System Design, manufacture And Install.
- Analog Camera Security System Design, supply And Installation.
- Steel Galvanizing Production Line Interfacing Device Design, proto Typing, Manufacturing And Installation.
Alem Steel Plc
- CGL LINE Rehabilitation And PLC Program Modification.
- Grain Color Sorter Machine Installation, cable Lying, duct Work And Commissioning.
- Automatic Sheet Shear Machine Installation And Programming.
Negati Textile Factory
Installation And Machine Erection PVC Plant, Raw Material Plant, foam Plant, And Compound Light And Machine Maintenance.
Assymba Engineering
3km pole erection and foundation works.
Rorank Businesses S.C
33 kv Mv distribution line ,33/15kv Net station works, 1250kvA transformer installation, XLP cabling works.
Showcase
Nixin Paper Manufacturing PLC
COMPLETED SUBSTATION PROJECT LAYOUTS
CONSTRUCTION METHODOLOGY
Excavation and Earth Work
TOWER ERECTTION
Concrete work
Rebar work
SAFARICOM WAKANDA CIVIL WORK PROJECT, CONCRETE CASTING
SITE FINISHING AND FENCE WORK
Previous Work Scenes




















Clients